Exterior project
Nomad
A Small Piece of Hell Icrontian
In this thread I'll be tracking the workflow of an exterior project I'll be doing. The base structure needs to be done by Monday the 23rd of August, but I think I may have more than what is expected done (Which is a good thing). Basically it's going to show pictures from start to finish.
The pictures are dated by time that the file was last saved (I save seperate files at key changes) The first picture is basically just outlining the outline wall of the building off of a CAD drawing, I made slices in the geometry at major points such as walls, doors, windows, etc. The second picture is extruding the top of the aforementioned geometry and stop and the bottom and tops of ledges, windows, doors, etc. The next three pictures are adding windows, which took probably the longest.
The pictures are dated by time that the file was last saved (I save seperate files at key changes) The first picture is basically just outlining the outline wall of the building off of a CAD drawing, I made slices in the geometry at major points such as walls, doors, windows, etc. The second picture is extruding the top of the aforementioned geometry and stop and the bottom and tops of ledges, windows, doors, etc. The next three pictures are adding windows, which took probably the longest.
0
Comments