ICHQ Detroit: Battle plans around ICSP
Things I'm hoping to do this month before/after ICSP:
1. We've got a backhoe coming Thursday to dig ditches at the house - there's 2 basement walls that need to be dug out and waterproofed and possible a third that's even worse off.
2. Four windows need to be replaced in the house.
3. Fix a tarp on the carriage house roof
4. The carriage house & basement still require a lot of cleaning out
5. Ivy removal from backyard & trees
6. Install cabinetry & kitchen sink plumbing
7. Misc help: fix exterior door, finishing half bath, rip up plywood floor in stairwell
1. We've got a backhoe coming Thursday to dig ditches at the house - there's 2 basement walls that need to be dug out and waterproofed and possible a third that's even worse off.
2. Four windows need to be replaced in the house.
3. Fix a tarp on the carriage house roof
4. The carriage house & basement still require a lot of cleaning out
5. Ivy removal from backyard & trees
6. Install cabinetry & kitchen sink plumbing
7. Misc help: fix exterior door, finishing half bath, rip up plywood floor in stairwell
0
Comments
Some manual labor would be good for me.