Getting ICHQ ready for Expo 2013
Here's some stuff we're working on for Expo. Last weekend, @Aaron and I completely hosed & squeegeed the basement. Up next:
- New lighting for the basement (with one switch to rule them all)
- Replace the one boarded up basement window for additional sunlight
- Repair brickwork & tuckpoint entire basement foundation as needed
- Repair holes & ridges in basement floor
- Demolish wooden walls in basement (opening 2/3 into 1 big area - equivalent to Great Room + Office + Hall + Stairwell + Foyer)
- New lighting for the carriage house interior
- Putting down pea gravel in the backyard (to fix the mudpit it's becoming)
- Emptying all the crazy from the carriage house (dumpster #3 has arrived)
6
Comments
What are you going for here...?
Shit, no, man. I believe you'd get your ass kicked sayin' something like that, man.
It is at this point I must, begrudgingly, admit to Brian, who I told basically every year that we should buy the damned tent instead of renting it... that perhaps it's best that he doesn't own a tent right now.
When you see how the backyard turned out, you will j in your p.
-Lincoln